压花地坪|艺术压印混凝土介绍:压印混凝土以特有的图案框架进行现场浇注、一次成型,用现浇混凝土地面,通过特制模具进行现场压印、脱模,喷涂保护剂及密封养护处理而成,其间配备拜石先进的技术、严谨的施工管理。能够使地面永久地呈现各种色泽、图案和质感,逼真地模拟自然地材质和纹理,如瓷砖、大理石、石板、卵石、砖、石块等。随性所欲地勾划各类图案,而且愈久弥新。使人们轻松地实现建筑物与人文环境、自然环境和谐相处,融为一体的理念。
Based on the newly paved concrete,impressed the texture with the special pattern,through the pattern impressing,mold-release and spraying the concrete sealer to achieve the embossed concrete with beautiful textures.Meanwhile,the advanced construction technology and rigorous construction managing are essential.The embossed concrete floor could be colorful,simulate the natural quality and the texture,such as ceramic,marble,flagstone,cobblestone,brick,stone and etc.could be realize all kinds of textures.and never fading charms.

 

施工工艺:浇筑基层混凝土Pouring the base concrete首先浇筑符合标准的混凝土,做好振动密实提浆等工作,再将混凝土表面水泥砂浆抹匀、做光平处理。注意:若混凝土是商混,则需与搅拌站沟通,商混中不得加入粉煤灰、矿粉等早强剂。原因加入早强剂后混凝土干的快,面层干的时候底层也是湿润的状态,压印后则会出现龟裂纹!

撒布彩色强化剂Dusting the color hardener浇筑基层混凝土Pouring the base concrete:首先浇筑符合标准的混凝土,做好振动密实提浆等工作,再将混凝土表面水泥砂浆抹匀、做光平处理。注意:若混凝土是商混,则需与搅拌站沟通,商混中不得加入粉煤灰、矿粉等早强剂。原因加入早强剂后混凝土干的快,面层干的时候底层也是湿润的状态,压印后则会出现龟裂纹!注意:作业面完成后3天左右,需及时清洗脱膜粉,脱膜粉清洗干净后,后面滚涂保护剂会
颜色会更加均匀好看;反之时间太长的话后期清洗困难,且难以清洗干净。将规定用量的2/3强化剂材料均匀撒布在初凝阶段的混凝土表面,待强化剂材料充分吸水润湿后用手工铁板找平收光完成第一次作业,待强化剂材料和混凝充分发生化学反应并初凝至一定阶段,再进行第二次1/3强化剂材料撒布收光找平作业。
Dust 2/3 of the dosage color hardener on the initial setting concrete,after the material absorb the water sufficiently,finish and leveling the surface,after a few hours,dust the rest 1/3 color hardener and then finish the leveling again.

找平收光:根据混凝土与强化剂的化学反应及硬化情况,实行至少三次以上的手工铁板收光找平作业,且收光操作应相互交错进行。After dusting the color hardener,need to do the finish and levelingwork carefully and at least more than3 times.

撒布脱模粉并模具压印:在强化剂材料和混凝土初凝到一定阶段,表面干燥无明显水分的情况下,均匀撒布一层与强化剂材料配套的着色脱模粉。用事先选择好规格图案模具压制花纹图案;压制时。用力应均匀一致,保持模具固定平整,压制图案要一次成型不能重压。

冲洗地坪表面:Wash the floor待混凝土地面压印成型作业完毕养护 48-72 小时(视气候)后,用高压水枪清洗压印混凝土表面脱模粉,粘结脱模粉较多部分,可用刷子配合清洗。待清洗完毕,压印混凝土完全干透后,涂刷无色透明密封保护剂,并封闭养护24小时。